Project Key Factors


Project Name:

Tonkin Highway Extension and Thomas Road Upgrade Project

Client:

Tonkin Extension Allianace (TEA)

Principal:

Main Roads Western Australia (MRWA)

Site Location:

Thomas Road to South Western Highway, Perth, Western Australia

Contract Period:

September 2026 – December 2027

Project Value:

Approximately $2.65 million (Ongoing)


The Project


The Tonkin Highway Extension and Thomas Road Upgrade Project is being delivered by the Tonkin Extension Alliance (TEA), a partnership between Georgiou Group, BMD, Civcon, GHD and BG&E together with Main Roads Western Australia. The project will create a high-standard north–south transport link between Thomas Road and South Western Highway, improving road safety, freight efficiency and connectivity in Perth’s Eastern Corridor.


The works comprise a 14km four-lane dual carriageway extension of Tonkin Highway with a Principal Shared Path along its full length, the widening and duplication of 4.5km of Thomas Road, new traffic bridges and at-grade intersections, pedestrian and equine underpasses, noise walls, drainage, lighting and intelligent transport systems. 


Our Scope


Mallee Karlip has been engaged by the Tonkin Extension Alliance to supply and install Western Power streetlighting across seven Western Power ML design packages, covering Thomas Road East and West, Abernethy Road, Orton Road, Bishop Road, Mundijong Road and Bilya Avenue, and South Western Highway, Jarrahdale Road and Shanley Road. The package includes approximately 14.5km of trenching and the installation of more than 280 street light poles and luminaires.


Our scope included:

  • Supply, excavation, installation, testing and handover of Western Power streetlighting 

  • Trenching, bedding and compaction of cable trenches, including road crossings by open trench or horizontal directional drilling where required

  • Installation of Contractor-supplied 6.5m and 12.5m galvanised street light poles, outreach arms and LED luminaires

  • Supply and installation of points of supply, including mini pillars, uni pillars and UMS pits

  • Supply, installation and termination streetlight and low voltage cabling

  • Liaison and coordination with Western Power for the start-up, handover and energisation of streetlight circuits

  • Attendance at handover walkdowns and close-out of punch-list items ahead of energisation

  • Preparation of redline mark-ups, as-constructed drawings and test results

  • Completion of quality documentation in accordance with TEA, MRWA, Western Power and Australian Standards requirements

  • Coordination and interfacing with TEA, Western Power, other subcontractors and existing service providers



 
 

EC15798

  • Mallee Karlip LinkedIn Page

We would like to acknowledge the traditional custodians of the land on which we are based on In Rockingham, the Wadjuk Noongar people. 
 

We pay our respects to our elders, past, present, and emerging, and acknowledge our continuing custodianship of this land. 
 

We also acknowledge the different traditional custodians of the the different lands we conduct our work on and appreciate the cultural diversity that exists across these lands.

Level 1, 17 Evinrude Bend, East Rockingham WA 6168

SN_Certified_ART.PNG

Proudly Supply Nation Certified

Copyright © 2023 Mallee Karlip - Website design by 3 Clouds Collective

bottom of page