<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Mallee Karlip]]></title><description><![CDATA[Mallee Karlip]]></description><link>https://www.malleekarlip.com.au/blog</link><generator>RSS for Node</generator><lastBuildDate>Wed, 28 Oct 2026 06:03:09 GMT</lastBuildDate><atom:link href="https://www.malleekarlip.com.au/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[Cockburn Cement Kwinana Process Plant Expansion]]></title><description><![CDATA[The Cockburn Cement Process Plant Expansion formed part of Cockburn Cement’s ongoing investment in upgrading and expanding its cement manufacturing facility in Western Australia. The project involved the installation and commissioning of new process plant infrastructure designed to improve production capacity, operational efficiency and long-term reliability.]]></description><link>https://www.malleekarlip.com.au/post/cockburn-cement-kwinana-process-plant-expansion</link><guid isPermaLink="false">6ae1653b18163c9dd5325644</guid><pubDate>Sun, 25 Oct 2026 03:02:51 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_30a1da3c92104711a75718f6d95a403b~mv2.jpg/v1/fit/w_800,h_450,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item><item><title><![CDATA[Perth Rail Network Radio Systems Upgrade]]></title><description><![CDATA[The Perth Rail Network Radio Systems Upgrade forms part of the Public Transport Authority’s broader program to replace ageing communications infrastructure across the Perth metropolitan rail network, supporting a new communications-based train control system designed to increase network capacity and deliver more reliable, punctual train operations. ]]></description><link>https://www.malleekarlip.com.au/post/perth-rail-network-radio-systems-upgrade</link><guid isPermaLink="false">6ae1664718163c9dd532591d</guid><pubDate>Sat, 24 Oct 2026 03:12:58 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_05dcf12b25944318bccd5803bab1a8db~mv2.jpg/v1/fit/w_1000,h_960,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item><item><title><![CDATA[BHP Nelson Point Electrical Shutdown Support]]></title><description><![CDATA[Nelson Point is part of BHP’s iron ore export operations at Port Hedland, one of the largest bulk export ports in the world. Mallee Karlip was engaged by Ventia to provide electrical labour and support during a planned shutdown at the facility, delivering works within the tight timeframes, safety requirements and access constraints of an operating port environment.]]></description><link>https://www.malleekarlip.com.au/post/bhp-nelson-point-electrical-shutdown-support</link><guid isPermaLink="false">6ae1648618163c9dd5325499</guid><pubDate>Fri, 23 Oct 2026 02:59:51 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_2b07dc1ad23d4f08b806cd2ca098a436~mv2.jpg/v1/fit/w_800,h_400,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item><item><title><![CDATA[Reid Highway Grade Separation Project]]></title><description><![CDATA[The Reid Highway Grade Separation Project involves upgrading signalised intersections along Reid Highway into grade-separated interchanges, removing traffic signals to improve safety, freight efficiency and traffic flow along one of Perth’s busiest arterial corridors.]]></description><link>https://www.malleekarlip.com.au/post/reid-highway-grade-separation-project</link><guid isPermaLink="false">6ae15dad597fe192d5f09d53</guid><pubDate>Thu, 22 Oct 2026 02:38:57 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_ec166f22f2d74c68afcb342356301002~mv2.png/v1/fit/w_1000,h_907,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item><item><title><![CDATA[Mandurah Estuary Bridge Duplication]]></title><description><![CDATA[The Mandurah Estuary Bridge Duplication project involved the construction of a second bridge alongside the existing Mandurah Estuary Bridge, doubling road capacity across one of the Peel region’s busiest estuary crossings. ]]></description><link>https://www.malleekarlip.com.au/post/mandurah-estuary-bridge-duplication</link><guid isPermaLink="false">6ae15ac262ff045f557bff7b</guid><pubDate>Wed, 21 Oct 2026 02:18:23 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_02a3ff4fba7b4f3795d150d08b641675~mv2.png/v1/fit/w_1000,h_941,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item><item><title><![CDATA[Tonkin Highway Extension and Thomas Road Upgrade Project]]></title><description><![CDATA[The Tonkin Highway Extension and Thomas Road Upgrade Project is being delivered by the Tonkin Extension Alliance (TEA), a partnership between Georgiou Group, BMD, Civcon, GHD and BG&#38;E together with Main Roads Western Australia. The project will create a high-standard north–south transport link between Thomas Road and South Western Highway, improving road safety, freight efficiency and connectivity in Perth’s Eastern Corridor.]]></description><link>https://www.malleekarlip.com.au/post/tonkin-highway-extension-and-thomas-road-upgrade-project</link><guid isPermaLink="false">6ae15657597fe192d5f08b0e</guid><pubDate>Tue, 20 Oct 2026 02:04:45 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/370f6b_48a5c78a4b2b40e48e25a7cc997875e2~mv2.jpeg/v1/fit/w_1000,h_1000,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>Mallee Karlip</dc:creator></item></channel></rss>